Piston & screw rebuilds

Ammonia compressor overhaul

An ammonia compressor overhaul is a planned strip, measure, and rebuild — not a parts swap on a running machine. Plants search this when suction pressure climbs, oil consumption rises, or running hours hit the OEM window. AmmoniaEquip overhauls open-drive pistons and oil-injected screws so the shutdown stays inside the production window.

When an ammonia compressor needs an overhaul

Hour meters are a starting point, not a verdict. Reciprocating NH₃ machines commonly reach a major strip between 15,000 and 25,000 hours; oil-injected screws often sit in the 30,000–50,000 hour band. Condition monitoring should beat the calendar: rising discharge temperature, metallic oil, shaft-seal weep, knock, or a slide valve that hunts at part load.

Overhaul during a low-load window — winter, a planned holiday, or a second machine covering the room. Emergency rebuilds cost more because rotors, valve-plate sets, and bearings have lead time. If repair quotes approach half the cost of a sound replacement frame, we say so before you open the casing.

  • Rising suction pressure or lost capacity at the same slide / unload position
  • Oil carry-over, dark or metallic oil, or frequent top-ups
  • Shaft-seal leak, coupling heat, or new vibration after a motor swap
  • Valve-plate temperature spikes or a knock that was not there last season

What a complete overhaul includes

Piston work covers valve plates as a set, liners, pistons and rings, connecting rods, crank journals, gaskets, and shaft-seal housing. Screw work covers male/female rotors, bearings, mechanical shaft seals, slide-valve travel, oil-system flush, and coupling alignment.

We isolate, pump down, lock out, and photograph the nameplate before tools come out. Clearances go on a sheet. After reassembly we laser-align the motor-compressor train — a few tenths of a millimetre of offset will destroy a new seal in days.

Overhaul, rebuild, or replace

Plants use these words interchangeably. In our workshop an overhaul is a full inspection and renewal of wear parts to a documented fit. A rebuild usually means selected failed items plus the seals and gaskets that must come off to reach them. Replacement is for cracked housings, scored rotors beyond grind limits, or frames where parts cost more than a remanufactured machine.

If you searched “ammonia compressor rebuild” or “compressor overhauling,” you are on the right job — the decision is condition, not vocabulary. Send hours, make/model, and a photo of the nameplate and we will say which path is honest.

Questions plants ask first

How long does an ammonia compressor overhaul take?

A planned piston strip with parts on the shelf is typically days, not weeks. Screw rotor or bearing work depends on inspection. Lead time is the parts, not the labour — order valve plates, seals, and bearings before the shutdown.

Can you overhaul on site or only in the workshop?

Seal, valve-plate, and alignment jobs can be field work. Full rotor or crank inspection is cleaner in the workshop. We stage the option that protects your production window.

Which brands do you overhaul?

Grasso piston and screw packages are the core of the workshop, plus Sabroe, Mycom, Howden, Vilter, and York machines identified from the nameplate. Brand names describe equipment we service, not a manufacturer partnership.